Hesperia California Homepage

Site Tools

Search
Why wasn’t my driveway paved / sealed after road work was done?
During road paving projects, driveway work is normally completed two weeks after completion of road work.

If your driveway requires repair, and more than two weeks have passed since the completion of road work, call Public Works Inspection at (760) 947-1434.

1.
2.
  1. Hesperia California Homepage

Contact Us

  1. The City of Hesperia, CA

  2.  9700 Seventh Avenue

  3. Hesperia, CA 92345

  4. Phone: 760-947-1000

Arrow Left Arrow Right
Slideshow Left Arrow Slideshow Right Arrow